Why AI data center delay penalties jumped from $1 million to $5 million
Tenants leasing AI data centers are now demanding more than $5 million a day in delay penalties, according to The Information's reporting, which ran on Sunday, October 25. That is roughly five times what tenants were asking as recently as this spring. These are demands made during negotiations, not signed contract terms, so the final amounts remain unknown.
The shift puts a price on the bottleneck that has slowed AI buildout for months: buildings and power that arrive later than planned. A penalty of that size turns a scheduling slip into a balance-sheet event for the developer. Trade and finance outlets picked up the story within hours, and Techmeme relayed the underlying reporting. Other coverage framed the same numbers as billion-dollar risk for builders.
How Marsh built delay-in-delivery insurance
The Information's account starts with the insurance broker Marsh. Mike Mathews, the firm's global digital infrastructure practice leader, put together a custom delay-in-delivery policy this spring for a developer whose tenant wanted $1 million a day if a campus phase missed its date. Within months, newer deals reportedly pushed the ask to $5 million and above, and that is what prompted brokers to sell new delay coverage to developers.
Marsh's Nimbus facility launched in June 2025 with up to $1 billion in construction all-risks limits and $365 million for delay in start-up. In January, Marsh raised the limits to as much as $2.7 billion. That climb in roughly seven months shows how quickly insurers are scaling to a risk that is only now getting its own product category.
The $1 million to $5 million comparison leans heavily on a single Marsh-arranged deal. The full Information article appears to be paywalled, and the coverage available for this story does not include broader sample data. Treat the trend as a strong signal rather than a measured market average.
What the SB Energy and OpenAI Ohio deal shows
One of the few public examples of how these terms work comes from a 10-gigawatt campus in Ohio. The Wall Street Journal reported the terms, citing SB Energy's IPO filing, and BeInCrypto summarized the arrangement. OpenAI receives one free day of rent for each day of delay, and that penalty doubles once a delay passes 90 days. Over a full year of delay, the structure works out to roughly 640 free rent days: 90 at the base rate and 550 at double.
The campus also depends on a 9.2-gigawatt gas plant that SB Energy will not own or run. That detail matters because it places part of the power supply, and its timing, outside the developer's direct control. A delay in that plant would reach the campus schedule regardless of how well the buildings are going up.
One analysis ran the arithmetic in a 247Wallst piece. At $5 million a day, a seven-month delay would cost more than $1 billion in penalties before lost rent. That is a hypothetical calculation, not a reported contract outcome.
Oracle has already used force majeure language on its own campus. In September, it issued a notice on its Project Jupiter campus in New Mexico, preserving its right to defer rent if power delays affect the planned 2028 opening, according to Crypto Briefing. Force majeure clauses can excuse delays caused by power or permitting problems, so a headline penalty may never turn into a payment. Tenants are also pushing for rent abatements, liquidated damages and, in some cases, termination rights tied to when power and buildings are ready.
Why power delays keep data centers late
Power, not chips, is the constraint analysts keep naming. One energy research firm found in July that power was the main obstacle to new data centers. Goldman Sachs, as cited in the same coverage, expects only about half of scheduled U.S. data center capacity to arrive on time. I could not locate the original Goldman research, so treat that estimate as secondhand.
Political backlash is adding a second source of delay. Trumbull, Connecticut, passed a moratorium on new data centers while allowing upgrades at existing sites, according to AI News Today. In Texas, Gov. Greg Abbott halted data center permits pending grid and water reviews and called for ending state tax incentives, as CNBC reported. In Ohio, Sen. Husted is promoting legislation to make large facilities cover their own grid and generation costs, in a race where Democrat Sherrod Brown has made data-center opposition a campaign issue.
Who absorbs the cost when schedules slip
Developers and their lenders now carry larger contingent liabilities whenever a schedule slips. That can tighten project financing, especially for smaller builders with less capital to absorb a penalty. For context on how heavily these projects depend on outside money, see USA 24's coverage of OpenAI's nearly $30 billion raise at a $1.25 trillion valuation.
Insurance can soften the blow, but policies cost money and carry their own limits. In my reading, that expense moves into project budgets rather than disappearing, which means delay risk becomes a line item that tenants and lenders will scrutinize. Developers that can deliver on schedule may find it easier to win the best tenants.
Utility ratepayers are the least visible party in this chain. If delays push utilities to build reserve capacity, the cost could eventually reach households. That is an inference from the grid-cost debate in Ohio, not a reported outcome.
Investors in data center REITs and AI infrastructure should watch whether delay costs appear in earnings or IPO filings. The SB Energy filing is one early example of the kind of disclosure to look for.
What business buyers should check in their contracts
Consumers have no direct step to take here. Businesses that buy cloud or colocation capacity can review the terms they already have. These checks reflect general contract practice rather than advice from the sources:
- The delivery date and what triggers it, such as power energization or building readiness
- Whether remedies are credits, liquidated damages, rent abatement or termination rights, and whether any of them are capped
- Which delays a force majeure clause excuses, including power and permitting problems
- How much notice a party must give before a delay remedy or termination right applies
What to watch next
Several signals will show whether these penalties are real money or negotiating posture. The first is whether the $5 million figure appears in signed contracts or public filings. The second is whether brokers keep raising delay limits and whether that coverage spreads beyond a handful of deals. Watch also whether Goldman's on-time estimate holds and whether local moratoriums spread past Trumbull. The SB Energy IPO filing will show how much of the Ohio structure investors actually see. Our read is that the clearest winners will be the developers who can energize buildings on time, and the clearest losers will be those who have to pay for the gap in cash or in more expensive capital.




